Highway In-Transit Tracking & Milestones
Live highway progress tracking, toll plaza checkposts, driver rest logs & estimated arrival times.
LR/26-27/0125 • Ref: INV-26-27-0142
To: Shree Ram Steels & Tubes (Delhi NCR)
E-Way Bill: 281982736410 • Valid: 22-11-2026
RJ-14-GB-4592
Driver: Subhash Gurjar (9829012345)
Dispatched: 20-11-2026 08:30 AM
Expected Arrival: 21-11-2026 03:19 AM
VKI Central Warehouse (Bay 3)
NH Highway Corridors Active
Consignee Site (Delhi NCR)
Highway Checkposts & GPS Milestones Log:
Jaipur VKI Loading Dock
20-11-2026 09:30 AM
Dispatched with E-Way Bill
Manoharpur Toll Plaza (NH-48)
20-11-2026 11:45 AM
Normal highway traffic
Kotputli Checkpoint
20-11-2026 02:10 PM
Speed 58 km/h, on schedule